Skip to main content
Version: 2.1.3

Change of Scheduling Period

By following the steps described earlier, the schedule will be registered. To change the periods of a previously assigned schedule, you need to access a scheduler that was created in advance, where you wish to modify the specified periods.

scheduler

After accessing a scheduler, the system will display the campaign addition interface, where it will be possible to change the periods by clicking on the "More Options" icon. Then, click on "Edit" according to the desired Layout.

scheduler

After clicking the button marked in the image above, the screen will display various templates that can be used to assign or modify dates and times for the display of the selected layout. After making the changes, simply click the "Update" button to save the modification made to the display period.

scheduler

By clicking the "Update" button, the system will recognize the changes made, adding or modifying the dates and times for the layout.

scheduler