Scheduler (Programming Grid)
Selecting the "layouts" button, linked to the scheduling, makes it possible to include a layout connected to a programming grid structure. In this feature, the user has the ability to set a display period for each included layout. If the period set by the user is exceeded, the next component from another layout will be automatically displayed, if available for display.

By clicking on "layouts" marked in the image above, you will need to click the “-->” button associated with the desired layout. This layout must contain the necessary components and elements to be configured as a Schedule, according to your preference.

After selecting the desired layout, the screen will display various template options. You can use them to set dates and times for the display of the chosen component. If you want to include a specific date for display, you will need to enable the "Date interval" option. After customizing the display period for the layout, click on “Registration”.

After selecting the desired layout and configuring the display period according to your preference, the layout will be added to the scheduler as a programming grid.

It is possible to add multiple layouts to the Schedule according to your preference by clicking on "New." Then, simply follow the same steps described earlier.
