Skip to main content
Version: <=2.0.1

Scheduler (Programming Grid)

By selecting the "layouts" button linked to scheduler, it becomes possible to include a layout linked to a programming grid structure. In this functionality, the user has the ability to define a period for displaying each layout included. If the period defined by the user is exceeded, the next component of another layout will be automatically displayed, if it is available for display.

scheduler

When you click on "layouts" in the image above, you need to click on the "-->" button associated with the layout you want. This layout should contain the component and elements needed to be configured as a Schedule, according to your preference.

scheduler

After selecting the layout you want, the screen will display various template options. You can use them to set dates and times for the display of the chosen component. If you want to include a specific date for the display, you will need to enable the "Date Interval" option. After customizing the layout's display period, click on "Registration".

scheduler

After selecting the desired layout and setting the display period to your preference, the layout will be added to the scheduler as a program grid.

scheduler

You can add several layouts to Scheduling according to your preference by clicking on "New", then just follow the same steps as described above.

scheduler