Scheduler
📄️ Scheduler Registration
The first step in registering a scheduler is to access the "Scheduler" tab. This function makes it possible to manage the playback of a sequence of components, offering flexibility by displaying the layouts in the period of your choice.
📄️ Main Layout
By selecting the "Layouts" button linked to the main Layout, you can include a layout of your choice. This will allow the continuous display of one or more components belonging to the added layout until a layout is scheduled in the "Scheduler." In other words, the layout added to the "main layout" space will be displayed until the scheduled programming in the "Scheduler" begins, and after the end of that programming, the main layout will be displayed again.
📄️ Scheduler (Programming Grid)
By selecting the "layouts" button linked to scheduler, it becomes possible to include a layout linked to a programming grid structure. In this functionality, the user has the ability to define a period for displaying each layout included. If the period defined by the user is exceeded, the next component of another layout will be automatically displayed, if it is available for display.
📄️ Change of Scheduling Period
By following the steps previously described, the schedule will be registered. To change the periods of a previously assigned schedule, you need to access a scheduler that was created in advance, where you want to modify the described periods.
📄️ Change Scheduler Information
To change the information included in the scheduler, you need to access the "Scheduler" tab and open the previously created scheduler, directed to the entry where you want to modify the data.
📄️ Removing a Main Layout
By following the steps described above, the schedule will be registered. To remove a main layout, you need to access a previously created schedule that you want to remove the layout from.
📄️ Removing a Layout From the Schedule
By following the previously described steps, the schedule will be registered. To remove a layout from the schedule, you need to access a previously created schedule where you want to remove the associated layout.
📄️ Scheduler Inactivation
To deactivate the scheduler, you need to access the "Scheduler" tab and click on the three dots next to the scheduler you want to deactivate (highlighted). Then, click on "Inactivate."
📄️ Scheduler Removal
To remove the scheduler, you need to go to the "Scheduler" tab and click on the three dots, directed to the Scheduler you want to remove (highlighted), then click on "Move to the Recycle Bin."